首页> 外文会议>IFAC Symposium on Information Control Problems in Manufacturing >Detecting Constraints in Supply Chain Reengineering Projects: Case Study of Data and Process Integration in a Hospital Pharmacy
【24h】

Detecting Constraints in Supply Chain Reengineering Projects: Case Study of Data and Process Integration in a Hospital Pharmacy

机译:检测供应链重建项目的约束:医院药房数据和过程整合的案例研究

获取原文

摘要

This paper discusses how messy data may be a hidden failure factor that Business Process Reengineering (BPR) projects typically cannot detect during the planning phase. Our case study deals with Supply Chain Management (SCM) within two major urban hospitals, involving $2 million in minimum stocks for drug inventory. Our project addresses the feasibility of the hospital's data warehousing integration, especially at the stage of Extract, Transform, and Load (ETL). We conclude with a proposed system architecture audit and verification method that may serve to guide reengineering project planning and execution.
机译:本文讨论了数据如何是多么杂乱的故障因素,即业务流程再造(BPR)项目通常在规划阶段无法检测到。我们的案例研究了两个主要城市医院内的供应链管理(SCM),涉及200万美元的药物库存股票。我们的项目解决了医院数据仓库集成的可行性,特别是在提取,变换和负载(ETL)阶段。我们结束了拟议的系统架构审计和验证方法,可用于指导再生化项目规划和执行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号