首页> 外文会议>Annual North American Waste to Energy Conference >Bituminous Pavement Constructed with Municipal Solid Waste Combustor Ash: Construction, Performance, and Economic Issues
【24h】

Bituminous Pavement Constructed with Municipal Solid Waste Combustor Ash: Construction, Performance, and Economic Issues

机译:用市政固体废物燃烧器灰烬构建的沥青路面:施工,性能和经济问题

获取原文

摘要

The Polk County Solid Waste Department, located in Polk County Minnesota, participates in a complete integrated solid waste management program that includes four other counties in northwest Minnesota. One component of the integrated solid waste management program includes the operation of a municipal waste combustor (MWC) that combusts approximately 65 tons per day of processed solid waste. The starved air design of the combustor causes low turbulence in the primary burning chamber minimizing particulate carryover through the system. This results in generation of approximately 12 tons per day of combined ash comprised of 98 to 99 percent bottom ash and 1 to 2 percent fly ash, by weight. In 1996 the facility installed an up-front separation facility, or materials recovery facility (MRF), that removes recyclable materials as well as non-processible or objectionable materials prior to combustion. The energy produced is sold in the form of steam to businesses adjacent to the facility. The ash generated by combustion prior to the 1996 installation of the MRP is referred to as "old ash" and was landfilled in a MWC ash landfill permitted by the Minnesota Pollution Control Agency (MPCA). The ash generated since installation of the MRF is referred to as "new ash", and is also placed in the permitted landfill. The chemical and physical differences between the new and old ash are important enough to warrant the two ashes being addressed separately for purposes of this utilization demonstration project. In 2000 and 2001, Polk County performed a demonstration of the feasibility of utilizing combined MWC ash as a partial replacement of aggregate in bituminous paving materials. The demonstration consisted of building and evaluating a section of county road using the MWC ash-amended bituminous. This paper presents the performance, construction and economics issues and results of this demonstration. The up-front environmental evaluations performed as part of this demonstration were previously presented by Lucido and Wilson. The final environmental evaluations of this demonstration are presented in this paper. Therefore, after a summary of the following relevant publications, the remainder of this paper will focus on the structural performance, construction and economics issues and results of this demonstration. The project was approved by the MPCA and supported by the Minnesota Resource Recovery Association, the Association of Minnesota Counties, the Minnesota Office of Environmental Assistance, the Minnesota State Representative for District 2A, the four partner counties adjacent to Polk County, the Polk County Board, the Polk County Highway Department, and the citizens of Polk County.
机译:波尔克县固体废物部门位于明尼苏达波尔克郡,参加了一个完整的综合固体废物管理计划,包括西北明尼苏达州的其他四个县。综合固体废物管理计划的一个部件包括市政废物燃烧器(MWC)的操作,燃烧每天约65吨加工固体废物。燃烧器的饥饿空气设计导致初级燃烧室中的低湍流使颗粒通过系统最小化。这导致每天12吨的组合灰分为98%至99%的底灰和1至2%的粉煤灰,重量的产生约12吨。 1996年,该设施安装了一个上前分离设施,或材料回收设施(MRF),可在燃烧前除去可回收材料以及不可加工或令人讨厌的材料。产生的能量以蒸汽形式销售给与设施相邻的企业。 1996年安装MRP之前由燃烧产生的灰分被称为“旧灰”,并在明尼苏达污染管制局(MPCA)允许的MWC ASH垃圾填埋场中填埋。由于安装MRF的安装而产生的灰分称为“新灰”,也被放置在允许的垃圾填埋场中。新的和旧灰之间的化学和物理差异足以让他们为该利用示范项目的目的分开解决两个灰烬。 2000年和2001年,波尔克县进行了利用MWC灰烬作为沥青铺路材料骨料的部分替代的可行性的演示。演示包括建设和评估县城的一部分,使用MWC Ash-Armended沥青。本文介绍了这一示范的表现,建设和经济问题和结果。作为本示范的一部分进行的上前环境评估以前由Lucido和Wilson呈现。本文提出了这一示范的最终环境评价。因此,在以下相关出版物概述后,本文的其余部分将侧重于本示范的结构性绩效,建设和经济问题和结果。该项目由MPCA批准,并由明尼苏达州县明尼苏达州的明尼苏达州的明尼苏达州县的明尼苏达州县,明尼苏达州2A州的明尼苏达州代表,这是波尔克县波尔克县董事会附近的四个伴侣县,波尔克县公路部,以及波尔克县的公民。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号