首页> 外文会议>Australasian Institute of Mining and Metallurgy Underground Operators' Conference >Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia
【24h】

Extraction of 5 Orebody Crown Pillar at the Isa Lead Mine, Mount Isa Mines Limited, Mount Isa, Queensland, Australia

机译:在澳大利亚昆士兰州伊萨Mount Isa Mines Limited in Isa Leadine的5矿石冠柱提取

获取原文

摘要

This paper describes the mining methods and strategy used to extract the 5 Orebody crown pillar at the Isa Lead Mine over the past five years. The bulk of the crown pillar was extracted by the use of sublevel open stope method. An uphole bench stope was mined to scavenge the remaining ore. Geomechanical issues associated with the crown pillar extraction are described. Stope sizes were gradually increased on a stope by stope basis. This has allowed the maximising of ore recovery while relevant risks were managed. The principles in designing ore rib pillars against various types of fill materials are also described.
机译:本文介绍了过去五年来提取ISA铅矿5矿石冠支柱的采矿方法和策略。通过使用Sublevel Open Stope方法提取冠部柱的大部分。挤出孔的长凳,以清除剩余的矿石。描述了与冠柱提取相关的地质力学问题。 Stope尺寸逐渐逐渐增加。这使得矿石恢复最大化,而相关风险管理。还描述了针对各种类型的填充材料设计矿石肋柱的原理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号