首页> 外文会议>Australasian Institute of Mining and Metallurgy Underground Operators' Conference >The Application of Advanced Undercutting at PT Freeport Indonesia's Deep Ore Zone Mine
【24h】

The Application of Advanced Undercutting at PT Freeport Indonesia's Deep Ore Zone Mine

机译:高级削减在PT自由港印度尼西亚深奥地区矿山的应用

获取原文

摘要

PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This paper describes some of the issues and challenges faced by the operation when introducing a new undercut method part way through the project. Advantages and disadvantages are discussed as well as the expected benefits of the new method.
机译:PT自由港印度尼西亚目前正在建设Doz Ine。它是25 000吨/天的挡块塌陷操作,计划在2002年第四季度达到设计的生产水平。本文介绍了在通过项目引入新的底切方法部分时,运行所面临的一些问题和挑战。讨论了优点和缺点以及新方法的预期益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号