Safety culture and organizational issues during decommissioning of nuclear power plants

机译:核电站退役期间的安全文化与组织问题

获取原文

摘要

In the late 1990's the Swedish Nuclear Power Inspectorate (SKI) was faced with regulating a decommissioning plant for the first time when the Swedish government decided to shut down Unit 1 of the Barseback nuclear power plant. SKI addressed three types of issues regarding this change - safety culture and organizational issues, technical issues, and nuclear waste issues. It was found that very little information was available on safety culture and organizational aspects of nuclear power plant closures. In contrast, substantial research and analysis regarding the technical requirements for shutdown and decommissioning have been conducted. SKI started to develop a long-term strategy for the regulation of decommissioning. Hence, SKI was concurrently 1) identifying and addressing any immediate safety issues, 2) developing an overall long-term approach to regulation and 3) obtaining more information on safety culture and organizational issues during decommissioning. The purpose of this paper is to further discuss safety culture and organizational issues during decommissioning.
机译:在1990年代后期,瑞典核电监察局(SKI)在瑞典政府决定关闭BARSE核电站的第1单元时,首次采用监管退役工厂。滑雪讨论了关于这种变革的三种问题 - 安全文化和组织问题,技术问题和核废物问题。有人发现,核电站封闭的安全文化和组织方面有很少的信息。相比之下,已经进行了关于关闭和退役技术要求的实质性研究和分析。滑雪开始制定一个监管退役的长期战略。因此,SKI同时为1)识别和解决任何直接安全问题,2)制定一项整体的长期法规方法和3)在退役期间获得有关安全文化和组织问题的更多信息。本文的目的是在退役期间进一步讨论安全文化和组织问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号