首页> 外文会议>International pipeline conference >RISK MANAGEMENT TO SUPPORT MAINTENANCE PLANNING AND INVESTMENT IN GAS TRANSMISSION PIPELINES
【24h】

RISK MANAGEMENT TO SUPPORT MAINTENANCE PLANNING AND INVESTMENT IN GAS TRANSMISSION PIPELINES

机译:风险管理支持维护计划和燃气传输管道投资

获取原文

摘要

Since 1999 PEMEX Gas (PGPB) has adopted a risk management scheme as common practice to support maintenance programming in a pipeline network of more than 11,000 kilometres. The risk management approach has been extensively used in the 14 working sites that comprise the pipeline division. Taking into account that over the past four years the pipeline incident rate has been significantly reduced and has thus lessened the consequence of failure cost in terms of reduced service interruption, property damage and safety, PGPB decided to re-evaluate and upgrade its risk management programme by enhancing the risk assessment tool to better reflect increased awareness and experience with the evaluation of the pipeline network risks. Decisions to implement risk-reduction activities derived from the results of the risk assessment phase are addressed in terms of "Dollars of Risk" by a quantitative risk model. Development of Tolerable Risk Criteria indicated the amount of risk that PGPB is willing to maintain in its pipeline facilities. This paper shows a case study of a risk management application, describing the benefits of having a methodology available to support maintenance planning and investment in pipeline systems.
机译:自1999年以来,Pemex Gas(PGPB)采用了风险管理方案,作为常规做法,以支持超过11,000公里的管道网络维修编程。风险管理方法已广泛应用于包括管道部门的14个工作地点。考虑到过去四年来,管道事故率大幅减少,从而减少了在减少服务中断,财产损害和安全方面的失效成本的后果,PGPB决定重新评估和升级其风险管理计划通过加强风险评估工具,以更好地反映增加管道网络风险的提高认识和经验。通过定量风险模型的“风险美元”来解决实施风险评估阶段结果的风险减少活动的决定。可容忍风险标准的发展表明,PGPB愿意在其管道设施中维护的风险。本文显示了风险管理应用的案例研究,描述了具有可用于支持管道系统的维护规划和投资的方法的益处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号