Progressively tightening environmental regulations have shaped the planning, design, construction and costs of dredged material disposal facilities. Total confinement, stabilization of contaminants, solidification, capping, beneficial use of amended sediments have become standard practice. Three case histories illustrate the design, construction and end use of confined disposal facilities (CDF) for contaminated dredged sediments. The first project in Baltimore is a 146-acre (59 ha) nearshore CDF constructed in 1980 to confine 3.5 million yds~3 (2.7 million m~3) of sediments, 600,000 yds~3 (460,000 m~3) of which were highly contaminated. The second project is an upland CDF in Boston, constructed in 1990 to contain 89,000 yds~3 (68,000 m~3) of solidified and stabilized contaminated harbor sediments. The third project in Brooklyn, which is currently under design, consists of a 4-acre (1.6 ha) nearshore CDF which will contain 140,000 yds~3 (110,000 m~3) of dredged contaminated sediments. The three projects are described and compared in terms of planning strategies, innovative engineering, design challenges, construction flexibility and end use.
机译:日益收紧的环保法规塑造的规划,设计,建设和疏浚物处置设施的成本。总约束,污染物,凝固,封盖的稳定,有利于利用修正的沉积物已经成为标准做法。三个历史案例说明了设计,施工和最终使用的受污染底泥疏浚密闭处置设施(CDF)。在巴尔的摩的第一个项目是一个146英亩(59公顷)近岸CDF 1980构造成限制沉积物350万个YDS〜3(270万米〜3),600000 YDS〜3(46万米〜3),其中是高度污染。第二个项目是在波士顿高地CDF,在1990构建为含有89000个YDS〜3(68000米〜3)的固化和稳定化的受污染的沉积物海港。在布鲁克林第三个项目,这是目前在设计中,由一个4英亩(1.6公顷)近岸CDF其中将包含挖出受污染的沉积物140,000 YDS〜3(11万米〜3)的。这三个项目的介绍和比较中的规划战略,创新的工程,设计挑战,施工灵活性和最终使用的术语。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号