首页> 外文会议>European conference on landslides >Monitoring and remedial works of the 2nd Vienna water supply line affected by landslides
【24h】

Monitoring and remedial works of the 2nd Vienna water supply line affected by landslides

机译:受山体滑坡影响的第二维也纳供水管线的监测和补救作品

获取原文

摘要

The last hundred kilometres of the 2nd Vienna water supply pipeline run through several landslides of the Flysch zone. Thus the supply system is constantly monitored by the municipal board of control (MA 31). Twice a year, after having been emptied the pipelines are checked for any new cracks, which are immediately repaired if necessary. Inside the pipelines convergence indicators have been installed in order to determine the deformations of the structure. Investigations by Finite-difference models (UDEC) were used as the basis for determining the stability and the operational safety of the 2nd Vienna water supply pipeline.
机译:第二千米的第二维也纳供水管道流过几个鸡肉区的山体滑坡。因此,供应系统由市政委员会(MA 31)不断监控。每年两次,在清空后,将检查任何新裂缝,如果有必要,立即修复。在管道内部安装了融合指示器,以确定结构的变形。使用有限差异模型(UDEC)的调查用作确定第二维也纳供水管道的稳定性和操作安全性的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号