首页> 外文会议>International Association of Hydrogeologists congress >Special hydrogeological problems along the ICE-High Speed Line Cologne ?Frankfurt
【24h】

Special hydrogeological problems along the ICE-High Speed Line Cologne ?Frankfurt

机译:浅速线岩石岩石的特殊水文地质问题?法兰克福

获取原文

摘要

The ICE-High Speed Line of the Deutsche Bahn AG (German Railways) is at present one of the biggest projects of civil engineering in Europe and it represents an investment of 8.0 Mrd. DM (3,9 billion $). Between Cologne and Frankfurt the alignment of 177 km passes a partially densely populated area which is intensively culturally used. Therefore the realization of this structure demands not only mastering civil engineering problems, but also a conflict management in view of other uses of the areas in question, mainly in view of the protection of natural reserves and groundwater resources. In the following civil engineering measures to solve such conflicts are dealt with.
机译:Deutsche Bahn AG(德国铁路)的冰高速系列目前是欧洲土木工程项目最大的项目之一,它代表了8.0德尔德的投资。 DM(390亿美元)。在科隆和法兰克福之间,177 km的对齐通过了部分密集的填充区域,这些区域被密集地使用。因此,这种结构的实现不仅需要掌握土木工程问题,而且考虑到有问题的其他地区的其他用途,也是冲突管理,主要是为了保护自然保护区和地下水资源。在以下土木工程措施中解决了这种冲突。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号