ASSEMBLY, INTEGRATION AND TEST CENTRE IN MALAYSIA: INTEGRATION BETWEEN BUILDING CONSTRUCTION WORKS AND EQUIPMENT INSTALLATION

机译:马来西亚的装配,集成和测试中心:建筑工程与设备安装之间的集成

获取原文

摘要

On 14th July 2009 at 0335 UTC, Malaysia created a history by being the first in the world to launch a satellite, RazakSAT, to a Near-Equatorial Orbit (NEQO). After launching four communication satellites and two remote sensing satellites, Malaysia is ready to take a step further by setting up an "Assembly, Integration and Test (AIT) Centre" which will be used for assembly, integration as well as the launch and environmental testing for a satellite. This will be another achievement for Malaysia as it shall be the first facility to be setup in ASEAN region. The construction of the AIT facility began on 12th October 2009 and it is expected to be completed within a period of eighteen (18) months. There will be six equipments which will be housed in the AIT centre, all which are procured separately and from overseas. This facility has been designed by local engineers and architects, with the inputs and requirements from each equipment supplier. This centre will be the next stepping stone for the development of space program in Malaysia; therefore it is critical that the planning and managing of the AIT facility is in line with the objectives of the country's space program and that includes monitoring closely on the construction of the AIT building and the integration of equipments into the building so that the final result will be a completed and workable AIT facility that meets all the specifications and requirements specified.
机译:2009年7月14日在UTC的0335年7月14日,马来西亚通过成为世界上第一个推出卫星,razaksat的近赤道轨道(Neqo)创造了历史。在推出四个通信卫星和两个遥感卫星之后,马来西亚即可通过建立“装配,集成和测试(AIT)中心”来进一步迈出,该中心将用于装配,集成以及发射和环境测试对于卫星。这将是马来西亚的另一个成就,因为它应该是在东盟地区建立的第一家设施。 AIT设施的建设始于2009年10月12日,预计将在十八(18)个月内完成。将有六种装备将被居住在AIT中心,所有这些都是单独采购的。该设施由当地工程师和架构师设计,每个设备供应商的投入和要求都是设计的。该中心将成为马来西亚太空计划开发的下一个踏脚石;因此,AIT设施的规划和管理符合国家空间计划的目标至关重要,包括密切监测AIT建筑的建设以及设备将设备的整合到建筑物中,以便最终结果是完成和可行的AIT工具,符合指定的所有规格和要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号