首页> 外文会议>ASES annual conference >2001: A SOLAR ODYSSEY
【24h】

2001: A SOLAR ODYSSEY

机译:2001年:太阳能奥德赛

获取原文

摘要

In October 1999, GSA New England installed a 30 kW BIPV array designed by Power Light, of Berkley, California, on a downtown Boston building. The array consisting of 372 panels began functioning on February 29, 2000 after much ado with the local utility. In July 2000, two panels, with shattered glass and a "slumped" appearance led us to the discovery of a water infiltration and corrosion process that forced us to take the array out of service. The fault mechanism has been identified. The plastic encapsulate used in the panel assembly process exerted more stress on the panel's glass component than had been witnessed in the laboratory or that had been anticipated. New panels will be manufactured by March 1, 2001. The re-installation is targeted for April 1, 2001. The process has been a "solar odyssey" for the General Services Administration.
机译:1999年10月,GSA新英格兰安装了由Calkley,加利福尼亚州伯克利的电源灯设计了30千瓦的BIPV阵列,位于波士顿市中心。由372个面板组成的阵列在2000年2月29日开始运作后,当局部实用程序很多。 2000年7月,两个面板,带有破碎的玻璃和“颓势”的外观,导致我们发现水渗透和腐蚀过程,迫使我们将阵列脱离服务。已经识别了故障机制。在面板组装过程中使用的塑料封装在面板的玻璃组件上产生了比实验室中的目击者或预期的更高的压力。新面板将于20​​01年3月1日之前制造。重新安装是针对2001年4月1日的目标。该过程是一般服务管理的“太阳能奥德赛”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号