10 Guidelines to Successful Substation Commissioning

机译:10成功变电站调试指导方针

获取原文
获取外文期刊封面目录资料

摘要

The commissioning of a substation is the process by which the substation, its design, equipment, wiring and protection is proven. Commissioning engineers and technicians provide the last line of defense for substation owners against engineering, manufacturing and installation mistakes. A skilled substation commissioning group can discover problems that were missed by everyone else. In contrast a poor commissioning group will miss issues that are easily discovered with proper testing. A poor commissioning group can even cause problems that can cost the owners time and money. The intent of this paper is to examine the process of substation commissioning and the system level problems that are too commonly missed during that process.
机译:变电站的调试是经过证明变电站,其设计,设备,布线和保护的过程。调试工程师和技术人员为变电站所有者提供了对抗工程,制造和安装错误的最后一系列防线。熟练的变电站调试组可以发现其他人错过的问题。相比之下,一个糟糕的调试小组将错过通过适当的测试容易发现的问题。一个糟糕的调试组甚至可能导致所有者时间和金钱的问题。本文的意图是检查变电站调试的过程和该过程中过于常见的系统级别问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号