Secrets Exposed: Improving Schedule Accuracy

机译:暴露的秘密:提高时间表准确性

获取原文
获取外文期刊封面目录资料

摘要

Welcome to my world. I'm the date the software for this product was going to ship (the socalled “End Date”). Note the words “was going to ship”. Everyone knows the software won't really ship on this date. I was chosen from 364 other dates because I was viewed as the most optimistic date a super hero could meet to deliver the product. When they first chose me, I was lauded with cheers of excitement and I was put in documents and on white boards everywhere. But now I'm nothing but cursed. They selected me pretty much at random. They didn't look at project history nor do any formal estimation methods. And of course, I was the only one chosen. They didn't have the foresight to give a range of delivery dates. As the project progressed, they really didn't look much at me, instead focusing on getting more features in and fixing all those bugs they introduced. I knew I was in trouble early in the project when the requirements document was published and it was only two paragraphs. And now they are saying some date halfway across the calendar is the new delivery date. I was doomed from the beginning… Does any of this sound similar to your product development end dates? Far too many of our software projects are late. As software engineers and software quality engineers, we must do a better job meeting our end dates. This paper will highlight some of the areas where we go wrong and give you some insight into how perform and influence better project scheduling, tracking and oversight, estimating and overall project management.
机译:欢迎来到我的世界。我是该产品的软件将要发货的日期(所谓的“结束日期”)。注意单词“正在发货”。每个人都知道该软件不会在此日期内运送。我被选自364个其他日期,因为我被视为最乐观的日期,超级英雄可以满足提供产品。当他们第一次选择我时,我被欢呼声赞成兴奋,我被送入了文件和白板到处都是。但现在我什么都没有被诅咒。他们几乎选择了我。他们没有看出项目历史,也没有做任何正式的估计方法。当然,我是唯一一个选择的人。他们没有远见提供一系列交货日期。随着项目的进展,他们真的没有看起来很多,而是专注于获得更多功能并修复他们介绍的所有这些错误。我知道当要求文件发布时,我在项目中遇到了麻烦,只有两个段落。现在他们在横跨日历中的一些日期是新的交货日期。我从一开始都注定了......这有什么声音类似于您的产品开发结束日期吗?我们的软件项目太晚了。作为软件工程师和软件质量的工程师,我们必须做一个更好的职位会议,我们结束日期。本文将突出一些我们出错的领域,并让您了解如何执行和影响更好的项目调度,跟踪和监督,估算和整体项目管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号