首页> 外文会议>Annual Meeting of the American Society for Surface Mining and Reclamation >An update on the winding ridge demonstration project for the beneficial use of CCBs to reduce acid formation in an abandoned underground mine
【24h】

An update on the winding ridge demonstration project for the beneficial use of CCBs to reduce acid formation in an abandoned underground mine

机译:绕线岭展示项目的更新,用于减少CCBS减少废弃地下矿区酸形成的

获取原文

摘要

The Maryland Department of Natural Resources Power Plant Research Program (PPRP) and the Maryland Department of the Environment Bureau of Mines (MDE) have undertaken the Western Maryland Coal Combustion By-Products (CCB)/Acid Mine Drainage (AMD) Initiative. The Initiative is a joint effort with private industry to demonstrate the beneficial application of CCBs to create flowable grouts for injection into underground mines to reduce the formation of acidity (i.e., AMD). The Initiative commenced in 1995 with the Winding Ridge Project, which is its first demonstration project of this technology. For this project, 5,600 cubic yards of CCB grout were injected into the Frazee mine in 1996. The grout consisted of 60 percent FBC product, and 20 percent Class F fly ash and FGD product, mixed with mine water. Over the course of the project, an extensive set of water quality data has been generated. Water quality monitoring started prior to grout injection in 1995, and continues through the current time. The purpose of this paper is to present the key findings of post-injection monitoring of the mine discharge water quality. Post-injection monitoring shows that there have not been any significant increases in AMD-related parameters or trace elements in themine water other than short-term or transient water quality changes immediately after injection. During this transient period, mine discharge showed elevated levels of iron, aluminum, total acidity and lower pH, as well as certain trace elements. Thesechanges are attributed in part to flushing acid waters from the mine during injection. About 1 year after grout injection, iron, aluminum, total acidity and trace element concentrations and loadings dropped to levels comparable to or below pre-injectionconditions. pH has also trended subtly upward over this time. Calcium and sulfate levels have been elevated since injection indicating some grout dissolution. Since grout cores recovered from the mine show that the hardened grout is intact and competent,and has retained its strength and low permeability, any dissolution appears to be limited to grout surfaces exposed to or in contact with acid mine water.
机译:自然资源电厂研究计划(PPRP)和矿山环境局的马里兰州部(MDE)的马里兰部门已开展的马里兰州西部煤燃烧副产品(CCB)/矿山酸性废水(AMD)倡议。该倡议是与私有企业的共同努力证明城市商业银行的有益应用创建注入到地下矿井流动的水泥浆以降低酸度的形成(即AMD)。该倡议于1995年开始与绕组岭项目,这是该技术的它的第一个示范项目。对于这个项目5,600 CCB灌浆立方码分别注入Frazee矿于1996年,由灌浆60%FBC产品,并且20%的F级粉煤灰,脱硫产物,用矿井水混合。在项目实施过程中,已经产生了一整套的水质数据。水质监测,注浆在1995年之前开始,并通过当前的时间继续进行。本文的目的是介绍注射后的监测矿排放水质的主要结果。注射后监测显示,再也没有出现过比短期或暂时性的水质等themine水在AMD相关参数或微量元素任何显著增加注射后立即改变。在这一短暂时期,矿放电显示水平升高铁,铝,总酸度和较低的pH的,以及某些微量元素。 Thesechanges被部分归因于注射过程中冲洗从矿山酸性水。关于注浆,铁,铝,1年后总酸度和微量元素的浓度和负荷下降到相当于或低于预定的injectionconditions水平。 pH值也微妙地趋于向上超过这个时间。因为喷射指示一些灌浆溶解钙和硫酸水平已经升高。由于灌浆芯从矿井表明,硬化水泥浆是完整的和主管,和保留了其强度和低渗透性恢复,任何溶解似乎仅限于灌浆表面曝露到或与酸矿井水接触。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号