首页> 外文会议>International Conference on Soil Mechanics and Geotechnical Engineering >The Second Heinenoord tunnel; the main monitoring results
【24h】

The Second Heinenoord tunnel; the main monitoring results

机译:第二个海伦诺德隧道;主要监测结果

获取原文

摘要

During the construction of the Second Heinenoord tunnel, the first large diameter bored tunnel in the Netherlands, an extensive monitoring program was executed to gain knowledge and experience about bored tunnels in soft soil. In this paper the mainresults will be described. Conclusions are drawn with respect to bore technology; borefront stability and influence of boring and grouting on surface settlements. Furthermore the design of the tunnel lining is discussed, given the staged construction ofthe lining and thrust forces during boring.
机译:在荷兰的第一个大直径钻孔隧道建设期间,执行了一个广泛的监测计划,以获得对软土钻孔隧道的知识和经验。在本文中,将描述MainResults。结论是关于钻孔技术的绘制;钻孔稳定性与钻孔灌浆对表面沉降的影响。此外,讨论了隧道衬里的设计,鉴于钻孔期间的衬里和推力的分阶段结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号