首页> 外文会议>IASTED International Conference on Power and Energy Systems >FAST AND OPTIMIZED LAGRANGIAN RELAXATION AND BUNDLING METHOD BASED THERMAL UNIT COMMITMENT AND ECONOMIC LOAD DISPATCH SCHEDULING IN LARGE SCALE POWER SYSTEMS
【24h】

FAST AND OPTIMIZED LAGRANGIAN RELAXATION AND BUNDLING METHOD BASED THERMAL UNIT COMMITMENT AND ECONOMIC LOAD DISPATCH SCHEDULING IN LARGE SCALE POWER SYSTEMS

机译:基于快速优化的拉格朗日放松和基于捆绑方法的大规模电力系统的热单元承诺和经济负担调度调度

获取原文

摘要

This paper presents LaGrangian Relaxation (LR) and Bundling Method (BM) based Unit Commitment (UC) and Economic Load Dispatch (ELD) solution techniques. Through these techniques, thermal units consisting of 45 generators have been applied. A comparison has been made with a data taken from the giant power utility in Malaysia, Tenaga Nasional Berhad (TNB) and the results found from this system has been compared to that of TNB results. Substantial costs saving of 0.049% have been achieved. A very fast scheduling system for UC and ELD along the said costs saving has also been gained. These two achievements have been the two main objectives of this research.
机译:本文介绍了拉格朗日放松(LR)和捆绑方法(BM)的单位承诺(UC)和经济负担调度(ELD)解决方案技术。通过这些技术,已经应用了由45个发电机组成的热单元。已经通过从马来西亚的巨型电力公用事业所采取的数据进行了比较,并将该系统发现的结果与TNB结果的结果进行了比较。已经实现了0.049%的大量成本。也获得了沿着说节省成本的UC和ELD的一个非常快速的调度系统。这两项成就是这项研究的两个主要目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号