首页> 外文会议>International in Situ and On-Site Bioremediation Synposium >A SYSTEMS' APPROACH TO IN-SITU BIOREMEDIATION: FULL SCALE APPLICATION
【24h】

A SYSTEMS' APPROACH TO IN-SITU BIOREMEDIATION: FULL SCALE APPLICATION

机译:系统原位生物修复方法:全规模应用

获取原文

摘要

An 18-month, in-situ biological program, specifically aimed at accelerating the current attenuation process such that the owner can sell the property began May 5, 2000. The remedial approach focused on bacterial population management, nutrient augmentation, terminal electron acceptor enhancement, and an efficient subsurface delivery of the enhancement liquids. Specifically, a novel delivery system, utilizing direct push advancement equipment coupled with high-pressure air and liquid systems allowed for uniform lateral distribution of the materials to the impacted capillary fringe zone. The treatment zone has extended from 9 to 11 feet below grade across the 20,000 square foot property. Preliminary analytical results from soils and groundwater at the site indicate that the targeted 18-month remediation time-line will be met. Samples from the groundwater and the soils 300 days into the eighteen-month program indicate total BTEX concentrations in the soils have been reduced an average of 76% with a 92% decrease in toluene. Groundwater BTEX levels have also seen a dramatic decrease, approaching targeted treatment levels in several of the wells within ten months.
机译:一个18个月的原位生物学计划,专门旨在加速当前的衰减过程,使业主可以出售该物业始于2000年5月5日。重点探讨了细菌人口管理,营养增强,终端电子受体增强的补救方法,以及增强液体的有效地下输送。具体地,利用具有直接推进设备的新型递送系统,其与高压空气和液体系统相连,允许材料的横向分布均匀地分布到受冲击的毛细管条纹区域。治疗区以20,000平方英尺的性质延伸到等级以下的9至11英尺。现场土壤和地下水的初步分析结果表明,目标为期18个月的修复时间线将得到满足。从地下水和土壤中的样品300天进入18个月的程序表明土壤中的总BTEX浓度平均降低76%,甲苯减少92%。地下水BTEX水平也有剧烈降低,在十个月内接近井中的几个井中的靶向治疗水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号