【24h】

Mining Train Delays

机译:采矿火车延误

获取原文

摘要

The Belgian railway network has a high traffic density with Brussels as its gravity center. The star-shape of the network implies heavily loaded bifurcations in which knock-on delays are likely to occur. Knock-on delays should be minimized to improve the total punctuality in the network. Based on experience, the most critical junctions in the traffic flow are known, but others might be hidden. To reveal the hidden patterns of trains passing delays to each other, we study, adapt and apply the state-of-the-art techniques for mining frequent episodes to this specific problem.
机译:比利时铁路网络具有高流量密度,砂轮作为其重力中心。网络的星形意味着大量装载的分叉,其中可能发生敲击延迟。应最大限度地减少敲门延迟,以提高网络中的总准时。基于经验,交通流量中最关键的交界是已知的,但其他可能是隐藏的。为了揭示彼此的延迟的列车隐藏模式,我们研究,适应和应用用于挖掘频繁发作的最先进的技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号