In a construction site of shield tunneling, the settlement of the ground surface was successfully kept to be much smaller than the predicted one by empirically adjusting the construction conditions such as the cutter face pressure and the back-filling one. The relationship between the ground settlement and the construction conditions was studied through the field measurement and visco-elasto-plastic FEM analysis in order to understand the mechanism of the settlement and to find a method for reducing the settlement. In the discussion, the ground displacement was divided into the pre-displacement induced in the ground before the machine tail passed the side track and the subsequent displacement induced in a long-term after passage of the machine tail, and then the relationship among both displacements and the construction conditions was investigated. The possibility has been confirmed that the settlement of the ground surface can be decreased by controlling the pre-displacement through the adequate control of the cutter face pressure and the back-filling one.
机译:在盾构隧道的施工现场,通过经验调节诸如切割面压力和后填充一个的施工条件,地面表面的沉降比预测的要小得多。通过现场测量和粘合 - 塑料FEM分析研究了地面沉降和施工条件之间的关系,以了解沉降机制,并找到一种降低沉降的方法。在讨论中,在机尾通过侧轨道之前,地面位移分为在地面上引起的预位移,并在机器尾部通过长期诱导的随后位移,然后是两个位移之间的关系并调查了施工条件。已经证实了这种可能性,通过通过对切割器面部压力的足够控制和背填充一个来控制预位移,可以降低地面的沉降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号