首页> 外文会议>International Conference on Computational Methods for Smart Structures and Materials >The effect of the powerful demolising equipment on the remaining part of the concrete bridge
【24h】

The effect of the powerful demolising equipment on the remaining part of the concrete bridge

机译:强大的拆卸设备对混凝土桥剩余部分的影响

获取原文

摘要

Given a 1000 ft. concrete bridge scheduled for renovation, in which the deck and its side paraptet walls will be replaced. New England Transportation Comsortium (NETC) decided to make further use of this project to find what effect will the heavy demolition tools have on the concrete to remain. The goal is to find out how much do the experimental results agree with the analytical results. In order to acco plish such a goal, numerous strain gages were installed in the vicinity of the demolition areas to measure the effect of the demolition on the adjacent areas. The gages are connected to data acquisition equipment, which is connected to a lap top computer to save all the acquired data. In the analytical part the energy method is to be used, which means that the energy applied by the demolition tools shjould equal the energy absorbed by the demolished structure, in elastic and plastic deformation forms. The wave equation is also to be used to find which method will have more severe effect on the remaining part of the bridge.
机译:给出1000英尺的混凝土桥预定用于装修,其中甲板及其侧面滑动墙将被替换。新英格兰运输COMSORTIUM(NETC)决定进一步使用该项目来查找重型拆卸工具对具体留下的效果。目标是找出实验结果与分析结果一致的人。为了加入这种目标,在拆除区域附近安装了许多应变计,以测量拆除对相邻区域的效果。这些评分连接到数据采集设备,数据采集设备连接到LAP顶部计算机以保存所有获取的数据。在分析部件中,使用能量方法,这意味着拆除工具施加的能量Shjould等于由弹性和塑性变形形式的拆除结构吸收的能量。波动方程也用于找到哪种方法对桥的剩余部分具有更严重的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号