首页> 外文会议>World energy engineering congress and environmental technology expo >ESPC IMPLEMENTATION AT THE NATIONAL ANIMAL DISEASE CENTER
【24h】

ESPC IMPLEMENTATION AT THE NATIONAL ANIMAL DISEASE CENTER

机译:ESPC在国家动物疾病中心实施

获取原文

摘要

The facilities at the United States Department of Agriculture, Agricultural Research Service, National Animal Disease Center (NADC), located in Ames, Iowa, support a scientific staff of approximately 230 persons conducting research on animal diseases with economic importance to the US livestock industry. Annual energy consumption has been on the order of 520,000 Btu/sqft and annual energy expenditures exceed $1.5 million. The opportunities for energy and energy cost savings are significant and the Center is participating as an initial site for the DOE SuperESPC program. Preliminary ESCO proposals have identified more than $500,000 of annual cost savings, as well as improvements that will improve the comfort for building occupants and reliability of Center infrastructures. Anticipated ECMs include lighting, incinerator stack heat recovery, VAV retrofit and HVAC controls, air pump replacement, propane-air mixing stations, as well as back-up generation equipment, and a combustion turbine for co-generation. It is anticipated a delivery order will be issued for some or all of the proposed ECMs and implementation will begin during 1999. From the perspective of a facility manager and engineer with recent experience, the paper will reflect upon the processes of identifying potential ECMs, development of project goals, working with an ESCO and contracting specialists, evaluating technical proposals and ESCO proposed ECMs, consideration of M&V approaches, developing agency management support, and working with the ESCO during construction installation. Positive and negative aspects of the process will be reported in order to help prepare facility managers to implement successful ESPC projects at Federal facilities.
机译:美国农业部的设施,农业研究服务,国家动物疾病中心(NADC),位于爱荷华州艾梅,支持大约230人的科学工作人员对美国畜牧业经济重视的动物疾病进行研究。年度能源消费量为520,000 BTU / SQFT,年度能源支出超过150万美元。能源和能源成本节约的机会很大,中心作为DOE超级型计划的初始网站参与。初步ESCO提案已经确定了超过500,000美元的年度成本节约,以及改善,以提高建立居住者和中心基础设施可靠性的舒适性。预期的ECM包括照明,焚烧炉堆叠热回收,VAV改装和HVAC控制,空气泵更换,丙烷 - 空气混合站,以及用于同一的备用发电设备和燃烧涡轮机。预计将为一些或所有拟议的ECM和实施发出交付订单,将于1999年开始。从设施经理和工程师具有最近的经验的角度来看,本文将反映识别潜在ECM的过程,发展项目目标,与ESCO和签约专家合作,评估技术提案和ESCO拟议的ECM,审议M&V方法,制定代理管理支持,并在建设安装期间与ESCO合作。将报告该过程的积极和消极方面,以帮助准备设施管理人员在联邦设施中实施成功的ESPC项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号