首页> 外文会议>Space Simulation Conference >JAMES WEBB SPACE TELESCOPE (JWST) INTEGRATED SCIENCE INSTRUMENTS MODULE (ISIM) CRYO-VACUUM (CV) TEST CAMPAIGN SUMMARY
【24h】

JAMES WEBB SPACE TELESCOPE (JWST) INTEGRATED SCIENCE INSTRUMENTS MODULE (ISIM) CRYO-VACUUM (CV) TEST CAMPAIGN SUMMARY

机译:James Webb Space Telescope(JWST)集成科学仪器模块(ISIM)Cryo-Favuum(CV)测试活动摘要

获取原文

摘要

JWST Integrated Science Instruments Module (ISIM) completed its system-level space simulation testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered to the next level of integration with the Optical Telescope Element (OTE), to form OTIS (OTE + ISIM), after concluding a series of three cryo-vacuum (CV) tests. During these tests, the complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration following mechanical environmental tests (vibration and acoustics). From one test to the next, shortcomings of the facility were uncovered and associated improvements in operational capabilities and reliability of the facility were required to enable the project to verify system-level requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.
机译:JWST集成科学仪器模块(ISIM)在美国宇航局戈达德航天飞行中心(GSFC)完成了其系统级空间仿真测试计划。 2016年3月,ISIM成功地与光学望远镜元件(OTE)成功地交付了与光学望远镜元件(OTE)的一系列集成,以形成OTIS(OTE + ISIM),在结束一系列三种Croudo-VACUUM(CV)测试后。在这些测试期间,特派团的复杂性产生了挑战性要求,要求从空间环境模拟器(SES)真空室中获得高度可靠的系统性能和能力。第一次测试用作风险降低试验;第二个测试提供了完全集成的飞行仪器的初始验证;在机械环境测试(振动和声学)之后,第三种测试验证了最终飞行配置中的系统。从一个测试到下一个测试,所揭示设施的缺点并有关的操作能力和设施的可靠性都是必需的,以使项目能够验证系统级要求。本文:(1)概述了实现JWST ISIM检测目标所需的综合机械和热设施系统,(2)比较了三个ISIM CV测试的整体设施性能和仪器,以及(3)总结从ISIM测试活动中汲取的经验教训。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号