首页> 外文会议>Annual international bridge conference and exhibition >Retrofit of swing span bridge using cable stay concept
【24h】

Retrofit of swing span bridge using cable stay concept

机译:使用缆绳保持概念的摇摆跨度桥梁改造

获取原文

摘要

The Berkley-Dighton bridge spans over the Tarnton River,connecting the towns of Berkley and Dighton,Massachusetts.Built in 1896,this four span bridge consists of three simple plate girder approach spans and a through-truss rim-bearing swing span.Time and the elements have taken their toll on this 100 year old swing bridge as evdenced by the heavy deterioration and damaged condition of the bridge components,and by the many maintenance repairs which have been conducted ower the years to alleviate some of the problems on the bridge.The bridge was previously rehabilitated in the 1930's and then again in 1973,but the effects of the harsh Northeastern winters resulted in a state of disrepair which initiated this latest rehabilitation effort.
机译:伯克利 - 伯顿桥横跨塔尔顿河,连接马萨诸塞州的伯克利和Dighton镇.1896年,这四个跨度桥组成了三个简单的板式梁接近跨度和一个穿过桁架轮辋轴承摆幅.Time和 这些要素在这座100岁的摇摆桥上取得了损失,因为桥梁组件的重大恶化和损坏状态,以及许多维修维修,这些维修维修已经在多年来减轻了桥上的一些问题。 这座桥头之前在1930年代恢复过来,然后在1973年再次恢复过来,但苛刻的东北冬季的影响导致了一种失修的状态,这一努力启动了这项最新的康复工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号