首页> 外文会议>Annual international bridge conference and exhibition >Fast track design speeds walt whitman bridge rehabilitation
【24h】

Fast track design speeds walt whitman bridge rehabilitation

机译:快速轨道设计速度Walt Whitman Bridge康复

获取原文

摘要

The Walt Whitman Bridge spans between Philadelphia,Pennsylvania and Gloucester,New Jersey,and is owned and operated by the Delaware River Port Authority (DRPA).This project is the first major rehabilitation of the bridge.The main bridge rehabilitation design featured many unique details,including 650,000 square feet of deck replacement,high strength steel tie plate replacement,pin and hanger retrofit,suspended span analysis,overnight deck replacement,and complicated friction collar jacking schemes to replace heavily loaded bearings for seismic performance.Traffic considerations were significant and mandated that all 6 traffic lanes be open for peak hours in order to carry the 110,000 daily vehicles.The entire rehabilitation design was completed on a fast track schedule of 11 months.This paper will discuss the background of the corridor rehabilitation program and will present some of the unique rehabilitation and retrofit measures.
机译:Phiradelphia,宾夕法尼亚州和格洛斯特,新泽西州的沃尔特惠特曼桥跨度,由特拉华河港口权威(DRPA)拥有和运营。这项项目是桥梁的第一个主要康复。主要桥梁康复设计具有许多独特的细节 ,包括650,000平方英尺的甲板更换,高强度钢结板更换,销和衣架改造,悬挂跨度分析,隔夜甲板更换,复杂的摩擦项链顶升方案,以替代严重装载的地震性能的轴承。推动的考虑因素是显着和强制性的 所有6个交通车道都可以为高峰时段开放,以便携带110,000辆车。整个康复设计在11个月的快速轨道时间表上完成。本文将讨论走廊康复计划的背景,并将出现一些 独特的康复和改造措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号