Berry's creek bridge reconstruction,a design and construction challenge

机译:Berry的溪桥重建,设计和施工挑战

获取原文

摘要

Time had taken its toll on the Route 3 Bridge over Berry's Creek and NJ Transit in northern New Jersey when Goodkind & O'Dea was charged with its rehabilitation.The 1,014 foot long structure,that connects Route 3 (a primary route to the Lincoln Tunnel and New York City) with Route 17 and the NJ Turnpike and provides access to the Meadowlands Sports Complex,had settled 2 1/2 feet at both ends since it was built 45 years before.The deck surface was worn from carrying more than 112,000 vehicles per day,and the bridge failed to meet current criteria for shoulder widths,seismic design and design speed (stopping sight distance).
机译:当Goodsind&O'Dea被指控康复时,时间已经在贝利的溪流3桥和新泽西州的NJ Transit的Tourt造成了Toll .1,014英尺长的结构,连接路线3(林肯隧道的主要路线) 和纽约市)与17号公路和NJ Tottpike,并可获得Meadowlands Sports Complex,他们在两端都落户,因为它在45年之前建于45年以前。甲板表面从携带超过112,000辆以上的车辆佩戴 每天,桥梁未能满足肩宽,地震设计和设计速度的当前标准(停止瞄准距离)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号