首页> 外文会议>International Conference on Flexible Automation and Interlligent Manufacturing >THE IMPLEMENTATION OF PROJECTS WITHIN BUDGET AND SCHEDULE.
【24h】

THE IMPLEMENTATION OF PROJECTS WITHIN BUDGET AND SCHEDULE.

机译:预算和时间表内的项目实施。

获取原文

摘要

The implementation of projects within budget and schedule performance criteria is generally considered as "could be improved". Why some projects might not achieve their objectives within pre-set parameters or achieve them at an unacceptable cost, is an issue that is constantly being evaluated. This paper describes the development of a model of 4 internal phases that may affect project teams during the implementation of projects, as an awareness of the totality of constraints affecting the implementation process is required if performance is to improve in the future.
机译:预算范围内的项目和进度绩效标准的实施通常被视为“可以改善”。为什么某些项目可能无法在预设参数内实现其目标或以不可接受的成本实现它们,这是一个不断进行评估的问题。本文介绍了4个内部阶段的模型,可能会影响项目在实施项目中的项目团队,因为如果绩效在未来改进,则需要了解影响实施过程的限制的整体。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号