首页> 外文会议>Artificial Neural Networks in Engineering Conference >Best value procurement using artificial intelligent ‘modified displaced ideal model’
【24h】

Best value procurement using artificial intelligent ‘modified displaced ideal model’

机译:使用人工智能'修改流离失所理想模型的最佳价值采购

获取原文

摘要

Many of the old rules for project delivery that held sway in the construction industry no longer have the same potency as they once did. Design-bid-build still has its many followers, but it does not always ensure performance due to the pressures of low cost. There is a growing movement in the construction industry towards Performance Based and Best Value procurement. Performance based procurement advocates that contractors who can optimize both price and performance can achieve best value. The major difficulty is finding an unbiased way to evaluate value vs. performance. The paper explores the development of a modified Displaced Ideal Model (Artificial Intelligent Decision Maker) to minimize subjectivity in "Best Value" procurements.
机译:在建筑行业中摇摆在建筑行业的旧项目交付规则中的许多旧规则不再具有与曾经一样的效力。设计出价仍然具有许多追随者,但它并不总是由于低成本的压力而无法确保性能。建筑行业在基于性能和最佳价值采购方面存在着越来越多的运动。基于绩效的采购倡导者能够优化价格和性能的承包商可以实现最佳价值。主要困难是寻找一个无法偏见的方式来评估价值与性能。本文探讨了改进的流离失所理想模型(人工智能决策者)的发展,以最大限度地减少“最佳价值”采购中的主观性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号