首页> 外文会议>International conference on the Israel society for ecology and environmental quality sciences >Infrastructure development after Oslo B in the West Bank governates of the Palestinian National Authority
【24h】

Infrastructure development after Oslo B in the West Bank governates of the Palestinian National Authority

机译:在巴勒斯坦国家当局的西部银行政府奥斯陆B后基础设施发展

获取原文

摘要

Water and wastewater infrastructure was either nonexistent or in a state of deterioration at the time of the establishment of the Palestinian Water Authority. Despite the lack of sufficient water supplies, the Palestinian Water Authority has been working to deliver new water supplies to unserved areas and at the same time is pushing a program of rehabilitation in order to reduce the quantities of either lost or unmetered water. A presentation will be made of the immediate needs of the Palestinian Water Authority for Palestinians in the West Bank districts. A summary will be made of the unserved towns and villages, of the ongoing rehabilitation projects, and a brief outline of the larger packaged projects that should be completed in the next couple of years. As a conclusion, a review will be made of Article 40 of Oslo B illustrating the status of the delivery of "allocated" water quantities during this "interim period" before the final status negotiations, where the rights of the Palestinians in the water resources of the region will be detailed.
机译:水和废水基础设施是不存在的或在建立巴勒斯坦水权威时的恶化状态。尽管有足够的水供应,巴勒斯坦水务局一直致力于将新的水供应交给卫生地区,同时推动康复计划,以减少丢失或未履行的水的数量。展示将由西岸巴勒斯坦人的巴勒斯坦水权威的直接需求。概述将由正在进行的康复项目的未运营的城镇和村庄制成,以及在未来几年内应完成的较大包装项目的简要概要。作为结论,审查将由奥斯陆B第40条制定,说明了在最终地位谈判之前“分配”水量的“分配”水量的地位,其中巴勒斯坦人在水资源中的权利该地区将详细。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号