首页> 外文会议>European conference on industrial furnaces and boilers >Hybrid Gas-Steam Combined Plants Equipped with Cpfbc. Part Two: Off-Design Anlaysis
【24h】

Hybrid Gas-Steam Combined Plants Equipped with Cpfbc. Part Two: Off-Design Anlaysis

机译:杂交气体蒸汽联合植物配备CPFBC。第二部分:设计分析

获取原文

摘要

The Off-Design behaviro of the two Hybrid Gas-Steam Combined Plants equipped with Pressurized Fluidized Bed Combustors designed in Part one of the present work has been analyzed. Off-Design behavior has been investigated by varying the following quantities: i) Base Line Gas Turbine IGV setting; ii) Base Line Gas Turbine inlet temperature, iii) Fluidized Bed Heat Exchanger bed height. Results show the capability of both plants to operate efficiently at reduced load.
机译:已经分析了配备有压力化流化床燃烧器的两个混合气体蒸汽组合设备的偏移行为已经分析了在本作一部分的一部分中。已经通过改变以下数量来调查了非设计行为:i)基线燃气轮机IGV设置; ii)基线燃气轮机入口温度,III)流化床热交换器床高度。结果表明,两种植物在减少负荷下有效地运行的能力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号