首页> 外文会议>Biennial conference on engineering systems design and analysis >CONTROL OF A TWO-STAGE ASSEMBLE-TO-ORDER MANUFACTURING SYSTEM UNDER DEMAND AND CAPACITY UNCERTAINTIES
【24h】

CONTROL OF A TWO-STAGE ASSEMBLE-TO-ORDER MANUFACTURING SYSTEM UNDER DEMAND AND CAPACITY UNCERTAINTIES

机译:控制需求和容量不确定性的两级组装有序制造系统

获取原文

摘要

This paper focuses on the production and assembly control in a two-stage assemble-to-order (ATO) manufacturing system. An ATO manufacturing system keeps inventory only at the component level, and products are assembled only after a customer order is received. ATO systems have a widespread use in various industries where mass customization is popular. The motivation of the problem is due to the need for firms in this setting to effectively coordinate the production of components and allocate the assembly line capacity shared across many different products. We model component production lines and a downstream product assembly line with M/M/1 queues in order to identify optimal policies regarding a firm's decision on how many components of each type to produce and how to prioritize orders for various products. We also propose an effective heuristic solution that is robust with respect to the number of product alternatives offered.
机译:本文侧重于两级组装秩序(ATO)制造系统中的生产和装配控制。 ATO制造系统仅在组件级别保持库存,仅在收到客户订单后才组装产品。 ATO系统在大规模定制流行的各个行业中具有广泛的应用。问题的动机是由于在此设置中需要公司,以有效地协调组件的生产并分配在许多不同产品中共享的装配线容量。我们使用M / M / 1队列模型组件生产线和下游产品装配线,以确定关于公司决定每种类型的组件的决定以及如何为各种产品进行优先级订单的最佳策略。我们还提出了一种有效的启发式解决方案,对提供的产品替代品的数量具有强大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号