首页> 外文会议>International conference on acid rock drainage >Reclamation at the richmond Hill Mine, lawrence county, south dakota
【24h】

Reclamation at the richmond Hill Mine, lawrence county, south dakota

机译:南达科他州劳伦斯县里士满山地矿山的填海

获取原文

摘要

The Richmond Hill Mine has recently completed a reclamation plan to mitigate Acid Ricl Drainage (ARD) which was identified at the toe of the former waste rock pile in 1992. Reclamation activities began in 1994 with the removal of ARD material from the waste rock pile and placement of this matrial in the former pit. This material was then isolated from the near surface environment by a low permeability capping system designed to minimize water and oxygen flow into the material. The cappling system consists of from bottom to top, six inches of limestione, 18 inches of low permeability clay liner, 4 and one-helf feet of thermal barrier/drain layer, and six inches of topsol. This capping system was completed in 1995.
机译:Richmond Hill Mine最近完成了在1992年以前废岩桩的脚趾鉴定的酸性RICL排水(ARD)的填海计划。填海活动始于1994年,从废岩桩中除去ARD材料将该基质的放置在前坑中。然后通过低渗透覆盖系统从近表面环境中分离出该材料,所述低渗透覆盖系统被设计成使水和氧气流入所述材料。倒卡系统由底部到顶部至顶部,六英寸的石英,18英寸的低渗透粘土衬里,4和尺寸的热障/漏极层,以及六英寸的Topsol。此封端系统于1995年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号