首页> 外文会议>International conference on acid rock drainage;ICARD 2000 >Reclamation at the richmond Hill Mine, lawrence county, south dakota
【24h】

Reclamation at the richmond Hill Mine, lawrence county, south dakota

机译:南达科他州劳伦斯县里士满希尔矿的填海

获取原文

摘要

The Richmond Hill Mine has recently completed a reclamation plan to mitigate Acid Ricl Drainage (ARD) which was identified at the toe of the former waste rock pile in 1992. Reclamation activities began in 1994 with the removal of ARD material from the waste rock pile and placement of this matrial in the former pit. This material was then isolated from the near surface environment by a low permeability capping system designed to minimize water and oxygen flow into the material. The cappling system consists of from bottom to top, six inches of limestione, 18 inches of low permeability clay liner, 4 and one-helf feet of thermal barrier/drain layer, and six inches of topsol. This capping system was completed in 1995.
机译:列治文山矿山最近完成了一项填海计划,以减轻酸废盐排放(ARD)的工作,该计划于1992年在前waste石堆的脚趾处确定。1994年开始了填海活动,从from石堆和and石中清除了ARD物质。将此物质放置在前坑中。然后通过低渗透率封盖系统将该材料与近地表环境隔离,该系统设计用于最大程度地减少水和氧气流入该材料的过程。封盖系统由下至上,六英寸的石灰石,18英寸的低渗透性粘土衬里,4英尺和1英尺的热障/排水层以及六英寸的表面溶胶组成。该封顶系统于1995年完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号