首页> 外文会议>Lead-zinc symposium >RECENT DEVELOPMENTS IN THE LEAD REFINING OPERATIONS AT BRITANNIA REFINED METALS LTD
【24h】

RECENT DEVELOPMENTS IN THE LEAD REFINING OPERATIONS AT BRITANNIA REFINED METALS LTD

机译:Britannia Refined Metals Ltd的领先炼油业务的最新发展

获取原文

摘要

Britannia Refined Metals Ltd. was built in 1931 to refine the lead bullion produced at the Mt. Isa mine in Queensland, Australia. Several periods of expansion and development have taken place over the intervening years, leading to major increases in the refining capacity for both lead and silver. A plant for treating recycled lead-acid batteries was added in 1976. This was redeveloped in the early 1990's to utilise Isasmelt technology for the smelting operations. Most recently the No.2 refinery kettle floor was extended to enable it to process lead bullion produced from two Imperial Smelting Furnaces (ISF), at Britannia Zinc Ltd. in Avonmouth, England and at MIM Hüttenwerke in Duisburg, Germany. This expansion included the provision of a plant for the hygienic handling of drosses and skims. This paper briefly describes the present primary refining operations and gives an update on the most recent developments in the process metallurgy and operating practices that have taken place.
机译:Britannia Refined Metals Ltd.于1931年建于1931年,优化澳大利亚昆士兰州伊萨矿的领先金条。在中间年内发生了几个膨胀和发展,导致铅和银的精炼能力增加。 1976年加入了一种用于治疗再生铅酸电池的植物。这在1990年初重新开发,以利用ISASMELT技术进行冶炼操作。最近,No.2炼油厂水壶楼层延长了,使其能够在德国荣南,英格兰和德国杜伊斯堡的MIMHüttenwerke加工由两个帝国冶炼炉(ISF)生产的引线。这种扩展包括提供一种用于卫生处理渣滓和脱脂的工厂。本文简要介绍了本主要炼油业务,并在进行的过程冶金和经营实践中提供了最新发展的更新。

著录项

  • 来源
    《Lead-zinc symposium》|2000年||共15页
  • 会议地点
  • 作者

    P.J. Moor;

  • 作者单位
  • 会议组织
  • 原文格式 PDF
  • 正文语种
  • 中图分类 TG146.12;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号