首页> 外文会议>International conference on coastal engineering >Cross-shore sediment transports on a cut profile for large scale land reclamations
【24h】

Cross-shore sediment transports on a cut profile for large scale land reclamations

机译:交叉岸沉积物运输在剪切轮廓上进行大规模陆地填海

获取原文

摘要

When building a large sxale land reclamation, the safest way is to shift the existign profile over the required distance of the reclamation project, up to a depth of say 20 m. This way the profile in cross-shore direction does not change and therefore also cross-shore sediment transports will be the same as before the land reclamation was made. A large disadvantage however is that a very large amount of material is needed for realising hte reclamation. This makes the reclamation very costly.
机译:在建立大型SXALE土地填海过程中,最安全的方式是在填海工程的所需距离上转移所需的概况,直至2米的深度。这样,交叉沿着横向方向的轮廓不会改变,因此交叉岸沉积物运输也会与在土地填充剂中进行的相同。然而,较大的缺点是实现HTE回收需要非常大量的材料。这使得填海件非常昂贵。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号