首页> 外文会议>Vibration Institute annual meeting >DECISION PROCESS AND EXPERIENCE IN REPAIRING A WRECKED TURBINE-GENERATOR Eastman Chemical Company Tennessee Eastman Division
【24h】

DECISION PROCESS AND EXPERIENCE IN REPAIRING A WRECKED TURBINE-GENERATOR Eastman Chemical Company Tennessee Eastman Division

机译:决策过程和经验修复失败的涡轮发电机伊斯特曼化学公司田纳西州伊士曼部

获取原文

摘要

Tennessee Eastman Division operates nineteen turbine-generators in three powerhouses. In December 1995, unit Number 10 oversped, which resulted in total destruction of the generator and significant damage to the turbine. This paper details the project to replace the generator with a used larger unit and repairs to the turbine including shaft replacement. Several problems arose during the project, including rotor modeling predicting a first torsional near running speed, coupling design concerns, and rotor modifications to fit the physical space requirements. Coordinating the project presented major problems because seven subcontractors including repair shops were involved.
机译:田纳西州伊斯特曼部门在三个动力驻地运营了19个汽轮机发电机。 1995年12月,10号单位超出,导致发电机的总破坏和对涡轮机的重大损坏。本文详细介绍了将发电机用过的较大的单元更换,并修理涡轮机,包括轴更换。在项目期间出现了几个问题,包括转子建模,预测第一扭转速度的第一个扭转速度,耦合设计问题和转子修改,以适应物理空间要求。协调项目提出了重大问题,因为涉及包括维修店的七个分包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号