首页> 外文会议>World energy engineering congress >The preliminary energy audit: an engineering high wire act
【24h】

The preliminary energy audit: an engineering high wire act

机译:初步能源审计:工程高电线法

获取原文

摘要

Preliminary energy audits, conducted during the proposal phase of the performance contract solicitation process, present unique challenges to the engineers who perform them. With limited time and information, the auditors must generate the savings estimates that will be used to shape the performance contracting proposal. If the savings numbers are tool low, the proposal may not be competitive. If they are too high, they may fuel unrealistic expectations that cannot be achieved. The preliminary energy audit is akin to an engineering high wire act: leaning too far in one direction or the other can result in disaster.
机译:在绩效合同征求过程的提议阶段进行的初步能源审计,对执行它们的工程师表示具有独特挑战。通过有限的时间和信息,审计师必须生成将用于塑造绩效合同提案的储蓄估计数。如果节省数量是较低的工具,则提案可能不会竞争。如果它们太高,他们可能会燃料无法实现的不切实际的期望。初步能源审计类似于工程高电线法:在一个方向上倾斜太远,或者其他可能导致灾难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号