DESIGN OF AN ANNEALING SUPPLEMENTAL SURVEILLANCE PROGRAM FOR THE PALISADES REACTOR PRESSURE VESSEL

机译:Parisades反应堆压力容器的退火补充监测计划的设计

获取原文

摘要

A decision to thermally anneal the Palisades reactor pressure vessel (RPV) was made in 1995 by Consumers Power Company. The anneal is currently planned for 1998 and will be conducted using an indirect gas-fired chamber method which will radiantly heat the RPV beltline region to nominally 454°C (850 ℉) for a one week (168 hour) hold time. The recovery of Charpy impact toughness properties after annealing will be ascertained by using a combination of a recovery model developed by Eason et al. and actual validation measurements on Palisades plant-specific surveillance materials. The use of plant-specific surrogate materials (from retired steam generators) and original surveillance program materials requires the development of a supplemental surveillance program focused at both recovery and reirradiation embrittlement. The post-anneal re-embrittlement properties are crucial for continued plant operation, and the current use of a lateral shift model for re-embrittlement trending is expected to be conservative. The program also uses reconstituted Charpy specimens and new surveillance capsules following the program format developed for ASTM Standard Guide for In-Service Annealing of Light-Water Cooled Nuclear Reactor Vessels, ASTM E 509-86 (1991), 1996 revision currently in ballot. This supplemental surveillance program should provide adequate toughness property definition for the Palisades key materials such that operation can be completed to the end of operating license and beyond if license renewal is pursued.
机译:以热退火帕利塞德反应堆压力容器(RPV)中的溶液通过消费者电力公司在1995年作出的决定。退火目前计划于1998年,并且将使用间接燃气室方法,其将辐射地加热RPV腰线区域以在名义上454℃(850℉)为一周(168小时)的保持时间进行。退火后的夏比冲击韧性性能的恢复将通过使用由奕等人开发了一种恢复模式的组合来确定。和帕利塞兹植物特有的监控材料的实际验证测量。具体的使用植物替代材料(从退休蒸汽发生器)和原始监视计划的材料需要补充监测计划的发展重点在两个恢复和再照射脆化。后退火再脆化性能是继续厂运行的关键,而目前使用的再脆化趋势的横向变速模型预期是保守的。该方案还采用重组摆锤标本和新的监视胶囊以下的ASTM标准指南开发轻水在职退火程序格式冷却核反应堆容器,ASTM E 509-86(1991),目前在选票1996年修订版。该补充监测计划应规定帕利塞德关键材料足够的韧性属性定义,使得操作可以完成运营牌照的末端,如果牌照续期是追求超越。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号