首页> 外文会议>International Electric Vehicle Symposium >Challenges at the construction of a comprehensive AC and DC charging infrastructure in Baden-Wurttemberg
【24h】

Challenges at the construction of a comprehensive AC and DC charging infrastructure in Baden-Wurttemberg

机译:挑战在巴登 - 符腾堡州的全面交流和直流充电基础设施建设

获取原文

摘要

The presentation "Challenges at the construction of a comprehensive AC and DC charging infrastructure in Baden-Wurttemberg" tells the story of the development and establishment of the charging infrastructure in and around Stuttgart - host of the EVS 30. It will detail how the AC charging infrastructure was developed and how it was rolled out to its present extent. The second part of the presentation will describe the establishment of the DC network and thus the creation of a comprehensive, Baden-Wurttemberg wide AC and DC charging network. In this paper the challenges will be addressed that were encountered on this seven year long journey and which learnings can be gained for other regions from the experience in Baden-Wurttemberg. As the development of the EnBW charging network had a strong influence on the development of electric mobility in Germany these interconnections will addressed appropriately. The final part of the presentation will be an outlook on the further development of the charging infrastructure as well on the technical side, e.g. 350 kW DC charging, but also regarding the extension of the charging network.
机译:“巴登 - 符腾堡州综合交流和直流收费基础设施建设”挑战“斯图加特斯图加特及其周围地区的开发和建立的故事 - EVS 30。它将详细说明AC充电方式开发了基础设施以及如何在目前推出。演示文稿的第二部分将描述直流网络的建立,从而建立了全面的Baden-WurtemberG宽AC和DC充电网络。在本文中,将解决这一挑战,这七年历史悠久的旅程遭到遇到的,并且其他地区可以获得来自巴登 - 沃特堡州的经验的其他地区。由于驻地收费网络的发展对德国电动机的发展产生了强烈影响,这些互连将适当地解决。演讲的最后一部分将是关于收费基础设施的进一步发展的展望,例如技术方面,例如, 350千瓦直流充电,还关于收费网络的延伸。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号