AC 154kV Submarine Interconnection System between Hwawon and Anjwa Island in Korea

机译:韩国人民币与安雅岛的AC 154kV潜艇互联系统

获取原文

摘要

The Hwawon - Anjwa submarine cable system including the biggest submarine power cables in Republic of Korea, field repair joint and termination has been in commercial service on November 2010. It was a landmark project in Republic of Korea, also for LS cable and KEPCO(Korea Electric Power Corporation), through four years of concentrated system engineering and construction. AC 154kV XLPE insulated 3 core submarine power cable with a fiber optic cable integrated will relieve the increasing power demands according to the feasibly anticipating offshore wind farm grid near the Anjwa Island. With respect to installation of the biggest size and weight of cable in Korea ever, the planning and optimization of the loading and installation equipments has been performed. The south-west sea of Korea with strong side currents in excess of 3 knots and frequent storm force winds was a challenging itself. In spite of harsh marine environment, Global marine and LS Cable have adopted the new laying methodology of twin simultaneous installation and accomplished without interruptions during approximately 2 weeks of actual implementation period. Two cable lines of 7 km each have been laid simultaneously to minimize construction period and costs upon the request of KEPCO and the whole length was protected with specially designed polyurethane pipes throughout the cable laying process. Additional cable protection methodology such as rock berm or direct burial has been applied over the laid cables by half of 2011.
机译:该花源 - Anjwa海底光缆系统,包括在韩国,现场修复关节和终止共和国最大的海底电力电缆已经在商业服务上2010年11月这是在韩国一个标志性工程,也是LS电缆和韩国电力公社(韩国电力公司),经过四年的潜心系统工程和施工。 AC 154KV交联聚乙烯绝缘与光纤电缆集成将根据附近的Anjwa岛可行预测海上风电场网格缓解增加的功率需求3芯海底电力电缆。对于安装的最大尺寸和重量在韩国电缆有史以来,规划和装载和安装设备的优化已经完成。韩国的西南部海面有超过3节和频繁的暴雨强风偏强电流是一个挑战自我。尽管恶劣的海洋环境,全球海洋和LS电缆都采用了双同时安装新铺设的方法,并在大约2周的实际执行期没有中断来完成。的每个7公里两个电缆线已铺设同时在KEPCO的请求并且整个长度以尽量减少建设周期和成本在整个电缆敷设过程专门设计的聚氨酯管得到了保护。其他电缆保护方法,如岩石护堤或直埋已由2011年上半年涂布在铺设电缆。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号