首页> 外文会议>International Symposium on High-voltage engineering >Measurement of very fast transient overvoltages (VFTO) in a GIS module
【24h】

Measurement of very fast transient overvoltages (VFTO) in a GIS module

机译:测量GIS模块中非常快速的瞬态过电压(VFTO)

获取原文

摘要

Gas Insulated Substations (GIS) have found a wide range of acceptance in power system for their compactness, high reliability and freedom from periodic maintenance (large mean time between failures). This paper deals with the design anddevelopment of capacitive voltage divider for measuring VFTO, as encountered in GIS. The short response time for the divider is achieved by forming the high voltage arm of the divider in the gas insulated bus-duct itself Further, the simulation of VFTOhas been carried out using Electromagnetic Transient Program (EMTP). The comparison of measured and the simulated VFTO validates, satisfactorily, the performance of the new divider.
机译:气体绝缘变电站(GIS)在电力系统中发现了各种验收,以实现它们的紧凑性,高可靠性和自由度,从周期性维护(故障之间的平均时间)。本文涉及电容性分压器的设计和开发,用于测量VIS,如GIS所遇到的。通过进一步在气体绝缘总线管道中形成分频器的高压臂进一步实现了分压器的短响应时间,使用电磁瞬态程序(EMTP)进行了vftohas的模拟。测量和模拟VFTO的比较验证,令人满意地,新分频器的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号