首页> 外文会议>International conference on wind engineering >The Millau vaduct-Special wind studies for an exceptional structure
【24h】

The Millau vaduct-Special wind studies for an exceptional structure

机译:Millau高架桥 - 特殊风采,卓越的结构

获取原文

摘要

The Millau viaduct will be a multi span cable stayed bridge crossing a deep valley. This structure, that will be 340 m high, will be exposed to strong winds either during construction stage or in service. Due to the presence of the surrounding mountains, the actual wind on the site exhibits unusual characteristics. Therefore the CSTB laboratory, that was in charge of the wind studies, had to perform extended tests and measurements to characterize the bridge behaviour.
机译:Millau高架桥将是一个多跨度电缆停留的桥,穿过深谷。这种结构,即340米高,将在施工阶段或服务中暴露在强风中。由于周围山脉的存在,现场的实际风呈现出不寻常的特征。因此,负责风研究的CSTB实验室必须进行扩展的测试和测量以表征桥接行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号