首页> 外文会议>Conference of the international group for lean construction >TOWARDS PRODUCTION CONTROL ON MULTISTORY BUILDING CONSTRUCTION SITES
【24h】

TOWARDS PRODUCTION CONTROL ON MULTISTORY BUILDING CONSTRUCTION SITES

机译:走向多层建筑施工地点的生产控制

获取原文

摘要

This paper reports a construction site intervention that is part of a research program devoted to the topic of production control in multi-story building construction. An early work by the authors introduced a preplanning method using the line of balance technique. This present work aggregates some tools previously used such as the Last Planner and Lookahead planning in order to develop a production control on site. The paper describes the application of site production control sub-system on a multi-story building construction site. The various steps used to implement the system are briefly described. The tools used by the crew were simple spreadsheets during the first phase and production cards (kanban) associated with some control charts derived from JIT and line of balance techniques. Information was managed using electronic spreadsheets. This work shows that production planning and control can be effectively implemented on construction sites, using very simple tools. These facts are in accord with the authors'conviction that a lasting lean construction change in the construction industry will be from the bottom up.
机译:本文报告了建筑工地干预,是研究计划的一部分,专门用于多层建筑建设中的生产控制主题。作者的早期工作推出了一种使用平衡技术的预扫描方法。本工作汇总了先前使用的一些工具,例如最后一个策划者和寻常规划,以便在现场开发生产控制。本文介绍了站点生产控制子系统在多层建筑施工现场的应用。简要描述用于实现系统的各种步骤。船员使用的工具在第一阶段和生产卡(Kanban)期间是简单的电子表格,与源自JIT和平衡技术的一些控制图表相关联。信息使用电子电子表格进行管理。这项工作表明,使用非常简单的工具,可以在施工现场有效地实施生产计划和控制。这些事实符合作者的特色,即建筑业的持久精益建设变化将来自自下而上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号