Improving the trough opening process at Premier Mine utilizing Electronic Delay Detonators

机译:利用电子延迟雷管改善优质矿井的低谷开放过程

获取原文

摘要

Premier Mine is a large underground diamond mine, situated at Cullinan in the Gauteng Province of South Africa. The mine hoists over 3 millions tons of diamond bearing kimberlite per year, from a modern, mechanized panel retreat block cave mining operation. Troughs sited at the base of the cave are developed into the overlying caved ore, allowing loading access to the ore through drawpoints. Trough opening is therefore a vital aspect of the mining operation. Most of the production is dependent on fast, reliable and safe trough opening. Successful trough openings are achieved under difficult mining conditions due to restricted void, long up-holes and the inherent properties of kimberlite-soft, elastic rock with a high swell factor. Early in 1998, Premier Mine undertook a joint development project (with an electronic initiation system supplier) to determine whether the use of a fully programmable electronic detonator system would enhance the mining cycle in the trough opening process. Blasting commenced in February 1998, initially with blasts of a similar size and duration to those that had been previously blasted with shock tube systems, to confirm the operational capabilities of the blasting system. The accuracy, reliability and flexibility of the Electronic Delay Detonators (EDDs) minimized associated risks for re-engineering of the trough opening process. Further, as blast timing was optimized, larger blasts were successfully initiated. To date over 20 troughs have been opened successfully with the use of EDDs. Not only did it take less time to open troughs, but also drilling and blasting operations have been optimized, as well as an overall improvement on safety. This paper details the benefits that EDDs have delivered to Premier Mine in this area. The logic followed is: 1. Review of the original trough opening practices 2. Re-engineering of the trough opening process 3. Implementation of EDDs 4. Evaluation of improvements and conclusions.
机译:总理煤矿是一个大型地下钻石矿,在南非豪登省位于天玺。该矿井提升超过3亿吨,每年金刚石轴承金伯利岩,从一个现代的,机械化的面板退块崩落采矿作业。在洞穴的基地选址槽被开发成覆崩落矿石,允许通过drawpoints装载访问矿石。因此槽开口在采矿作业的一个重要方面。大部分生产的是依赖于快速,可靠和安全的槽开口。成功的槽开口难以开采条件由于受限制的空隙,长可达孔和金伯利岩软,弹性岩石具有高膨胀系数的固有性质下实现的。早在1998年,国务院矿井进行了联合开发项目(带有电子启动系统供应商),以确定使用一个完全可编程的电子雷管系统是否会提高槽开放过程中的采矿周期。爆破开始于1998年2月,最初用一个相似的大小和持续时间,以那些曾与激波管系统先前已经喷砂的爆炸,以确认爆破处理系统的操作能力。的准确性,可靠性和电子延迟雷管的灵活性(EDDS)最小化,以槽开口过程的重新设计相关的风险。此外,由于爆炸时间进行了优化,更大的爆炸是成功启动。迄今为止超过20槽已与使用EDDS的成功打开。它不仅需要更少的时间来开槽,也是钻孔和爆破作业进行了优化,以及对安全的整体改善。本文详细介绍的EDD在这方面已经交付给总理矿的好处。该逻辑随后是:1.审查的改进和结论的EDD 4.评价的槽开口过程3.执行的原始槽开口做法2.重新工程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号