首页> 外文会议>International conference on advances in steel structures >Prestressing and loading tests on shanghai pudong intern ational airport terminal
【24h】

Prestressing and loading tests on shanghai pudong intern ational airport terminal

机译:上海浦东国际机场航站楼的预应力和装载测试

获取原文

摘要

The full-scale truss composed of arch-beam and cable used in the roof structure of Shanghai Pudong International Airport Terminal has been tested in the stages of prestressing and loading conditions respectively.Linear and nonlinear analytic models were established and numerical simulation was performed,which give good agreement with the test results.Both the test and analysis show that the linear theory has sufficient accuracy to indicate the behavior of the roof structure under static loading.
机译:由上海浦东国际机场码头的屋顶结构中使用的拱形梁和电缆组成的全尺寸桁架已经在预应力和装载条件的阶段进行了测试。线性和非线性分析模型进行了建立,进行了数值模拟,哪个与测试结果达成良好的一致性。试验和分析表明,线性理论具有足够的准确性,以指示屋顶结构在静态负荷下的行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号