首页> 外文会议>International coal preparation exhibition conference >'Turbo Column' Floatation at Kleinkopje Colliery, South Africa
【24h】

'Turbo Column' Floatation at Kleinkopje Colliery, South Africa

机译:'涡轮柱'浮动在南非克莱诺普省煤矿

获取原文

摘要

Reviewing the results of the completed small scale pilot testwork and the results of industrial scale pilot testwork to date, the following are important points: 1. The target yield and CV established during small scale pilot testwork were achieved and exceeded during industrial scale pilot testwork. 2. When relating yield and CV to particle size, small scale and industrial scale pilot testwork results were similar. 3. The reagent dosage required to achieve the target yield and CV was very similar for small scale and industrial scale pilot testwork. The above 3 points show clearly that scale-up from the 160 mm diameter column to the 4 m diameter column was successful.
机译:审查完成的小规模飞行员验证的结果及产业规模试验试验结果的结果迄今为止,以下是重要观点:1。在工业规模试验验证期间实现并超出了小规模试验验证期间建立的目标产量和CV。 2.在将产量和粒径与粒径相关时,小规模和工业规模的导频验证结果相似。 3.达到目标产量和CV所需的试剂剂量对于小规模和工业规模的先导验证非常相似。以上3点清楚地显示,从160 mm直径柱向4米直径柱进行扩展成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号