首页> 外文会议>International conference on high-level radioactive waste management >The environmental protection agency's waste isolation pilot plant certification process: the steps leading to the decision
【24h】

The environmental protection agency's waste isolation pilot plant certification process: the steps leading to the decision

机译:环境保护局的废物隔离试验工厂认证过程:导致决定的步骤

获取原文

摘要

On October 30,1997,the United States (U.S.) Environmental Protection Agency (EPA) issued a proposed rulemaking~1 to certify that the Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) will comply with the radioactive waste disposal regulations set forth at 40 CFR Part 191.~2 If the EPA's final decision is consistent with the proposal,the WIPP decision is consistent with the proposal,the WIPP could become the nation's first deep underground disposal facility for transuranic (TRU) radioactive waste generated as a result of defense activities.Since WIPP is a first-of-a-kind facility,the EPA's regulatory program contains an abundance of unique technical questions,as well as controversial polity considerations and legal issues.The purpose of this paper is to discuss the process that the EPA undertook to reach its proposed decision.
机译:2017年10月30日,美国(美国)环境保护局(EPA)发布了拟议的Rulemaking〜1,以证明能源部(DOE)废物隔离试验工厂(WIPP)将符合放射性废物处理规定在40 CFR部分191.〜2如果EPA的最终决定与提案一致,那么WIPP的决定与该提案一致,WIPP可能成为国家第一个为Transuranic(TRU)放射性废物的地下处置遗产而成为a国防活动的结果。威光水平是一个始终如一的设施,EPA的监管计划包含丰富的独特技术问题,以及争议的政策考虑和法律问题。本文的目的是讨论该过程EPA承诺达成其拟议的决定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号