【24h】

Re-opening of Mining at Mt Lyell

机译:在Mt Lyell重新开放矿业

获取原文

摘要

The Mt Lyell Mine at Queenstown, Tasmania was re-opened in 1995 by Copper Mines of Tasmania Pty Ltd, a wholly owned subsidiary of Mt Lyell Mining Co Ltd. The re-opening followed over 100 years of copper and gold mining at Mt Lyell. Major changes in practice were implemented across the site. Preventing further damage to an already disturbed environment was a major priority. Sublevel caving, at a lower cut-off grade, replaced open stoping for the deep underground mining. Development and later stoping are handled by a contractor, National Mine Management Pty Ltd, in the largest underground contract awarded at the time. Large scale sublevel caving was new to Mt Lyell and not widely practised in Australia, requiring studies and systematic development of the method, particularly in drilling and blasting. Rehabilitation and upgrading of mine infrastructure have been and will continue to be a challenge. The mine has, since 1995, retained to being a stable producer with potential for growth.
机译:塔斯马尼亚州皇后镇的MT Lyell Mine于1995年通过塔斯马尼亚Pty Ltd的铜矿重新开业,该公司的MT Lyell Mining Co Ltd.的全资子公司重新开放,00年在Mt Lyell的铜和金矿。实践中的重大变化是在本网站上实施的。防止对已经受​​扰动的环境的进一步损害是一个重大优先事项。在较低的截止级,在较低的截止级,更换了深度地下采矿的开放式停止。发展和后来停止是由国家矿山管理PTY LTD的承包商处理,该公司在当时最大的地下合同中。大规模的Sublevel Caving是Mt Lyell新的,在澳大利亚并未广泛实施,需要研究和系统的方法,特别是在钻孔和爆破中的制作。矿井基础设施的康复和升级已经持续存在挑战。自1995年以来,矿井保留为稳定的生产国,具有增长潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号