首页> 外文会议>Australasian Institute of Mining and Metallurgy Underground Operators' Conference >The Implementation of Selective Mining Practices at Hadleigh Castle Mine, Charters Towers
【24h】

The Implementation of Selective Mining Practices at Hadleigh Castle Mine, Charters Towers

机译:在Hadleigh Castle Line的选择性采矿实践的实施,毛座塔楼

获取原文

摘要

SMC Resources Limited is implementing a selective mining approach at the Hadleigh Castle mine, formerly operated by Aurora Gold Limited. The main ore zone has a length of 250 metres and dips at 40 - 45 deg to the south. Gold mineralisation occurs in a variety of quartz-sulphide lodes in sericitised granodiorite. Shallow dips, alteration intensity and mineralisation style combine to make mining relatively difficult. Previously unworked, high-grade, shallow dipping (30 - 45 deg), narrow quartz-sulphide lodes within the hanging-wall of the deposit are also being selectively exploited. Annual production of 35 000 oz Au is forecast from 185 000 tpa ore grading 6.5 g/t Au over a currently envisaged mine life of six years. Operations completed to-date include deepening the decline and access development of the first two levels beneath the previous workings. Longhole stoping operations have commenced in the main ore zone with air leg stoping also underway in the hanging wall lodes.
机译:SMC Resources Limited正在在Hadleigh Castle Lime在哈德利城堡矿井中实施一种选择性采矿方法,以前由Aurora Gold Limited运营。主矿区的长度为250米,朝南40-45°折叠。黄金矿化发生在同系菌状的Granodiorite中的各种石英 - 硫化物乐节中。浅层,改变强度和矿化风格结合,使采矿相对困难。此前未得到的,高档,浅浸渍(30 - 45°),沉积壁内的狭窄石英 - 硫化物乐节也被选择性地利用。从目前设想的矿山寿命为605 000 TPA矿石预测,预测了35 000盎司Au的年产35 000盎司AU。迄今已完成的业务包括深化以前的工作下的前两个级别的下降和获取开发。长孔停止运营已经在主矿区开始,气腿止挡也在悬挂墙租赁中进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号