首页> 外文会议>Clean Coal Technology Conference >OPERATING EXPERIENCE AT THE WABASH RIVER COAL GASIFICATION REPOWERING PROJECT
【24h】

OPERATING EXPERIENCE AT THE WABASH RIVER COAL GASIFICATION REPOWERING PROJECT

机译:Wabash River煤气化重新驱动工程的经验

获取原文

摘要

The Wabash River Coal GasificationRepowering Project (WRCGRP), a joint venture betweenDestec Energy, Inc., And PSI Energy, Inc., begancommercial operation in November of 1995. The Project,selected by the United States Department of Energy(DOE) under the Clean Coal Program (Round IV)represents the largest operating coal-gasificationcombined-cycle plant in the world. This demonstrationproject has allowed PSI Energy to repower a 1950svintage steam turbine and install a new syngas-firedcombustion turbine to provide 262 MW (net) ofelectricity in a clean, efficient manner in acommercial utility setting while utilizing locallymined high-sulfur Indiana bituminous coal. In doingso, the project is also demonstrating some noveltechnology while advancing the commercialization ofintegrated coal-gasification combined-cycletechnology. This paper will discuss the improvementsto the process and operations of the gasification andpower block as a result of experiences gained fromearly commercial operating experience of the Wabash Project.
机译:WABASH RIVER煤气化发动资助项目(WRCGRP)是1995年11月BETENESTEC ENERGY,INC。和PSI Energy,Inc。的合资企业,1995年11月。该项目由美国能源部(DOE)选择在干净下煤炭计划(第四轮)代表了世界上最大的运营煤气化循环植物。该演示项目允许PSI能量来重新推回1950年封面汽轮机,并安装新的合成气燃烧Combustion涡轮机,以在使用当地的高硫印第安纳烟煤中的辅煤层型实用环境中以干净,有效的方式提供262 MW(净)电极。在Toingso中,该项目也在展示一些诺曲线,同时推进整合煤气化联合环保的商业化。本文将讨论改善气化AndPower块的过程和运营,因为经验获得了Wabash项目的商业经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号