首页> 外文会议>International conference on probabilistic safety assessment and management >Core Damage Frequency Estimation Using Accident Sequence Precursor Data: 1990-1993
【24h】

Core Damage Frequency Estimation Using Accident Sequence Precursor Data: 1990-1993

机译:核心损伤频率估计使用事故序列前体数据:1990-1993

获取原文

摘要

The Nuclear Regulatory Commission's (NRC's) ongoing Accident Sequence Precursor (ASP) program uses probabilistic risk assessment (PRA) techniques to assess the potential for severe core damage (henceforth referred to simply as core damage) based on operating events. The types of operating events considered include accident sequence intiators, safety equipment failures, and degradation of plant conditions that could increase the probabilitythat various postulated accident sequences occur. Such operating events potentially reduce the margin of safety available for prevention of core damage and thus can be considered as precursors to core damage. The current process for identifying, analyzing, and documenting ASP events is described in detail in Vanden Heuval et al[1]. The significance of a Licensee Event Report (LER) event (or events) is measured by means of the conditional probability that the event leads to core damage, the so-called conditional core damage probability or, simply, CCDP.
机译:核监管委员会的(NRC)正在进行的事故序列前体(ASP)计划使用概率风险评估(PRA)技术来评估严重核心损坏的可能性(从此提到简称为核心损坏)。所考虑的操作事件类型包括意外序列interiator,安全设备故障和植物条件的降解,可能会增加各种假发事故序列的可能性。这种操作事件可能降低可用于预防核心损伤的安全余量,因此可以被视为核心损坏的前体。在Vanden Heuval等[1]中详细描述了识别,分析和记录ASP事件的当前过程。被许可人事件报告(或事件)的重要性通过条件概率来衡量,即事件导致核心损坏,所谓的条件核心损坏概率或简单地,CCDP。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号